Brigade Morgan Heights
- Homes
- 2, 3, 4 BHK · 1,251 to 2,599 sq ft
- Campus
- On request
- Possession
- June 2030 (RERA); December 2029 (target)

Under construction apartments project by Brigade Group at Sholinganallur, OMR, Chennai, with 3, 4 BHK & duplex of 1,726 to 2,545 sq ft, priced ₹2.39 Cr onwards. 662 homes on 6.54 acres, possession December 2031 (RERA).




Sholinganallur, OMR, Chennai · Apartments · Under construction · Updated 3 November 2026
Brigade Altius is a premium high-rise community of 662 homes on about 6.5 acres at Sholinganallur, beside the ELCOT SEZ on OMR. Three 43-storey towers are linked by skybridges, which will make Altius one of the tallest residential projects on the IT corridor.
Homes are 3 and 4 BHK plus duplexes, from about 1,726 to 2,545 sq ft, with a 50,000 sq ft podium-level clubhouse and shared amenity deck. The project was launched in January 2025 and is under construction, with RERA completion registered for December 2031.
In short: Brigade Altius offers 3, 4 BHK & duplex of 1,726 to 2,545 sq ft, priced ₹2.39 Cr onwards, on 6.54 acres with 662 homes. It is at the under construction stage, with possession December 2031 (RERA).
Brigade Altius is under construction. Buying now spreads payments over the construction period, and you can track progress on site and on the TN RERA portal. GST of 5% applies to under-construction homes (1% for affordable homes).
Home types, areas and indicative prices.
| Configuration | Size | Price |
|---|---|---|
| 3 BHK | 1,726 to 1,857 sq ft | ₹2.39 Cr onwards |
| 4 BHK | about 2,545 sq ft | ₹3.60 Cr onwards |
| Duplex | on request | on request |
Prices are indicative as of 3 November 2026 and exclude taxes, stamp duty, registration, parking and other charges. They vary by floor, facing and view. Ask for a written unit-wise quote.
These are illustrations based on the starting price, not quotes. In Tamil Nadu, stamp duty and registration on under-construction homes are usually levied on the land share (UDS) and construction agreement separately; your actual cost depends on the guideline value and unit.
Beyond the home price, set aside stamp duty (7%) and registration (2%) on the applicable value in Tamil Nadu, GST of 5% on under-construction homes where applicable, and one-time charges for club membership, maintenance deposit, corpus fund and EB/water connections. Most banks lend up to 75-90% of the property value depending on the loan size, so plan the balance from your own funds. Make sure both your EMI and the construction-linked instalments fit comfortably before you sign.
Move the sliders to see the monthly EMI, total interest and upfront cash you would need.
Illustrative only. Your bank decides the final rate and eligibility.
A quick way to tell whether this project fits your plans.
Homes from about ₹2.39 Cr give more space and a better amenity package than older buildings in the same area.
The OMR tech parks are within a short drive, which keeps the daily commute manageable.
Construction is visible on site, which reduces the uncertainty of buying off-plan.
Lifestyle and everyday facilities planned for the community.



Amenity lists describe the finished project. Ask which facilities will be ready at handover and which follow in later phases, and check the monthly maintenance charge that will pay for them.
Sholinganallur, OMR, Chennai
Sholinganallur is the main junction on OMR, where the road meets the Sholinganallur-Medavakkam Road and the link to ECR. ELCOT SEZ, Infosys, Accenture and dozens of other offices are within a few minutes, and the Phase 2 metro will have stations here. It is one of the most liquid resale and rental markets in Chennai.
Old Mahabalipuram Road (Rajiv Gandhi Salai) is Chennai's IT corridor and its busiest new-launch market, from Sholinganallur and Navalur down to Siruseri, Kelambakkam and Thaiyur. The parallel East Coast Road adds beach-side and senior-living projects.
| Destination | Distance / time |
|---|---|
| ELCOT SEZ | next door |
| Sholinganallur junction | about 1 km |
| Medavakkam | about 8 km |
| Velachery | about 12 km |
| Chennai airport | about 23 km |
Approximate, and dependent on traffic. Drive the route at your usual commute hour before deciding.
What supports demand here, and what to keep in mind.
The main reasons buyers shortlist Brigade Altius are: Landmark 43-storey towers on OMR; Walk-to-work for ELCOT SEZ; and Brigade's listed-developer track record. On the other side of the ledger, the points to weigh are: Long wait: possession late 2031; and High-rise density of 662 homes.
For apartments, resale value depends on the micro-location, the size of the community (more homes means more resale competition) and the quality of construction and maintenance over time. Rental demand follows jobs, so check the distance to the nearest major employment hub at peak hours.
Phase 2 of Chennai Metro (Corridor 3) is being built along OMR towards SIPCOT, which is the single biggest reason prices here have kept rising. Expect premium high-rises near Sholinganallur, mid-segment apartments around Navalur and Kelambakkam, and villas and plots past Siruseri and Thaiyur. ECR, a few kilometres east, offers quieter, low-rise living near the beaches.
A few rules apply to every purchase: compare the effective price per sq ft of carpet area across your shortlist, check the developer's delivery record on similar projects in Chennai, and model returns with conservative appreciation and realistic rent. This is general information, not financial advice.
A balanced view to take into your site visit.
How the homes are planned, and what to check on your visit.
Brigade Group was founded in Bengaluru in 1986 and is listed on the NSE and BSE. It builds homes, offices, retail and hotels across South India, and in Chennai is known for World Trade Center Chennai, Brigade Xanadu and Brigade Residences at Perungudi.
Brigade's newer Chennai projects target the premium end, with international architects, low-density planning and large clubhouses. Its listed status and long track record give buyers more transparency than many local developers. Brigade Altius is part of the developer's current pipeline in Chennai.
Representative images. Ask for the latest official renders and site photographs.





The usual path from first enquiry to registration for Brigade Altius.
Share your budget and configuration. You'll get the current price sheet and availability for Brigade Altius.
Tour the sales gallery and model home, and check the location at your commute hour.
Pay the booking amount to the developer, receive the allotment letter and sign the agreement for sale.
Pay instalments as per the schedule, then complete stamp duty and registration at the sub-registrar office.
Pay booking and instalment amounts only by cheque, DD or bank transfer into the project's designated account in the developer's name, and keep the official receipt for every payment. Never pay an individual directly.
Brigade Altius RERA status: TN/29/Building/0020/2025. Search the number on the official Tamil Nadu RERA website (rera.tn.gov.in) to confirm the promoter name, sanctioned plan, number of units registered and declared completion date before you pay anything. RERA also requires developers to keep 70% of buyer collections in a separate project account, to state carpet area, and to compensate buyers for delays.
Prices, dates and specifications are indicative and subject to change. Please confirm the latest details before booking. See Disclaimer.
If Brigade Altius doesn't fit your budget or timeline, these are worth a look.
Brigade Altius is at Sholinganallur, OMR, Chennai. Sholinganallur is the main junction on OMR, where the road meets the Sholinganallur-Medavakkam Road and the link to ECR.
Brigade Altius is developed by Brigade Enterprises Ltd.
Brigade Altius is priced ₹2.39 Cr onwards. Prices exclude GST (where applicable), stamp duty, registration and other charges, and vary by floor, facing and view.
3 BHK: 1,726 to 1,857 sq ft; 4 BHK: about 2,545 sq ft; Duplex: on request.
TN/29/Building/0020/2025. Verify it on the Tamil Nadu RERA website (rera.tn.gov.in) before paying.
December 2031 (RERA).
Land: 6.54 acres. Homes: 662 homes. Structure: 3 towers of 43 floors with skybridges.
50,000 sq ft podium-level clubhouse, skybridges linking the three towers, shared amenity deck with pool, gym, indoor games and multipurpose hall, landscaped podium gardens.
ELCOT SEZ (next door); Sholinganallur junction (about 1 km); Medavakkam (about 8 km); Velachery (about 12 km).
It depends on your horizon. In its favour: Landmark 43-storey towers on OMR; Walk-to-work for ELCOT SEZ. The main trade-off: Long wait: possession late 2031. Compare carpet-area prices with nearby projects before you decide.
On an 80% loan against the entry price at 8.5% for 20 years, the EMI would be about ₹1,65,928 per month. Use the calculator on this page to change the loan, rate and tenure.
Use the enquiry form on this page. We'll send the current price sheet, floor plans and payment plan, and arrange a site visit.
Tell us the configuration, your budget and when you'd like to move in. We'll reply with availability, the price sheet and a visit slot.