Brigade Altius
- Homes
- 3, 4 BHK & duplex · 1,726 to 2,545 sq ft
- Campus
- 662 homes
- Possession
- December 2031 (RERA)

Under construction apartments project by Ashiana Housing at Nemmeli, ECR, Chennai, with 1, 2, 3 BHK (senior living) of 912 to 1,462 sq ft, priced ₹82 L onwards. About 585 homes (all phases) on 10.87 acres, possession January 2028 (RERA).




Nemmeli, ECR, Chennai · Apartments · Under construction · Updated 3 November 2026
Ashiana Swarang is a senior-living community by Ashiana Housing and Arihant Foundations on 10.87 acres at Nemmeli on East Coast Road, where the backwaters meet the sea. Phase II offers 1, 2 and 3 BHK homes from about 912 to 1,462 sq ft in low-rise blocks at roughly 40 homes per acre.
Senior living here means age-friendly design (grab bars, wide doors, lifts), 24-hour care staff, a dining hall and organised activities run by the developer. It suits retirees and adult children buying for parents. Check the monthly service charges, which are higher than in a regular apartment.
In short: Ashiana Swarang Phase II offers 1, 2, 3 BHK (senior living) of 912 to 1,462 sq ft, priced ₹82 L onwards, on 10.87 acres with about 585 homes (all phases). It is at the under construction stage, with possession January 2028 (RERA).
Ashiana Swarang Phase II is under construction. Buying now spreads payments over the construction period, and you can track progress on site and on the TN RERA portal. GST of 5% applies to under-construction homes (1% for affordable homes).
Home types, areas and indicative prices.
| Configuration | Size | Price |
|---|---|---|
| 1 BHK | about 912 sq ft | ₹82 L onwards |
| 2 BHK | about 1,227 sq ft | ₹1.29 Cr onwards |
| 3 BHK | about 1,462 sq ft | up to about ₹2.5 Cr |
Prices are indicative as of 3 November 2026 and exclude taxes, stamp duty, registration, parking and other charges. They vary by floor, facing and view. Ask for a written unit-wise quote.
These are illustrations based on the starting price, not quotes. In Tamil Nadu, stamp duty and registration on under-construction homes are usually levied on the land share (UDS) and construction agreement separately; your actual cost depends on the guideline value and unit.
Beyond the home price, set aside stamp duty (7%) and registration (2%) on the applicable value in Tamil Nadu, GST of 5% on under-construction homes where applicable, and one-time charges for club membership, maintenance deposit, corpus fund and EB/water connections. Most banks lend up to 75-90% of the property value depending on the loan size, so plan the balance from your own funds. Make sure both your EMI and the construction-linked instalments fit comfortably before you sign.
Move the sliders to see the monthly EMI, total interest and upfront cash you would need.
Illustrative only. Your bank decides the final rate and eligibility.
A quick way to tell whether this project fits your plans.
Age-friendly design, on-site care staff and developer-run services make daily life easier for seniors living independently.
Entry pricing around ₹82 L keeps a branded home within reach on a joint home loan.
The OMR tech parks are within a short drive, which keeps the daily commute manageable.
Lifestyle and everyday facilities planned for the community.



Amenity lists describe the finished project. Ask which facilities will be ready at handover and which follow in later phases, and check the monthly maintenance charge that will pay for them.
Nemmeli, ECR, Chennai
Nemmeli is on East Coast Road between Kovalam and Mahabalipuram, where the Buckingham Canal backwaters meet the sea. It is quiet and green, with hospitals at Kelambakkam and the OMR IT corridor about 20 minutes inland.
Old Mahabalipuram Road (Rajiv Gandhi Salai) is Chennai's IT corridor and its busiest new-launch market, from Sholinganallur and Navalur down to Siruseri, Kelambakkam and Thaiyur. The parallel East Coast Road adds beach-side and senior-living projects.
| Destination | Distance / time |
|---|---|
| Kovalam beach | about 5 km |
| Kelambakkam hospitals | about 12 km |
| Mahabalipuram | about 20 km |
| Sholinganallur | about 25 km |
| Chennai airport | about 45 km |
Approximate, and dependent on traffic. Drive the route at your usual commute hour before deciding.
What supports demand here, and what to keep in mind.
The main reasons buyers shortlist Ashiana Swarang Phase II are: Purpose-built senior living; Low-rise, low-density; and Backwater and sea setting. On the other side of the ledger, the points to weigh are: Higher monthly service charges; and Far from city hospitals.
For apartments, resale value depends on the micro-location, the size of the community (more homes means more resale competition) and the quality of construction and maintenance over time. Rental demand follows jobs, so check the distance to the nearest major employment hub at peak hours.
Phase 2 of Chennai Metro (Corridor 3) is being built along OMR towards SIPCOT, which is the single biggest reason prices here have kept rising. Expect premium high-rises near Sholinganallur, mid-segment apartments around Navalur and Kelambakkam, and villas and plots past Siruseri and Thaiyur. ECR, a few kilometres east, offers quieter, low-rise living near the beaches.
A few rules apply to every purchase: compare the effective price per sq ft of carpet area across your shortlist, check the developer's delivery record on similar projects in Chennai, and model returns with conservative appreciation and realistic rent. This is general information, not financial advice.
A balanced view to take into your site visit.
How the homes are planned, and what to check on your visit.
Ashiana Housing is a listed developer best known in India for senior-living and comfort-homes communities, with projects in Rajasthan, NCR, Pune, Jamshedpur and Chennai.
In Chennai it partners with the local developer Arihant Foundations & Housing. Its senior-living projects include on-site care, dining and activity services managed by the developer, which is a different proposition from a regular apartment. Ashiana Swarang Phase II is part of the developer's current pipeline in Chennai.
Representative images. Ask for the latest official renders and site photographs.





The usual path from first enquiry to registration for Ashiana Swarang Phase II.
Share your budget and configuration. You'll get the current price sheet and availability for Ashiana Swarang Phase II.
Tour the sales gallery and model home, and check the location at your commute hour.
Pay the booking amount to the developer, receive the allotment letter and sign the agreement for sale.
Pay instalments as per the schedule, then complete stamp duty and registration at the sub-registrar office.
Pay booking and instalment amounts only by cheque, DD or bank transfer into the project's designated account in the developer's name, and keep the official receipt for every payment. Never pay an individual directly.
Ashiana Swarang Phase II RERA status: TN/35/Building/0242/2025 (Phase II); TN/35/Building/0057/2024 (Phase I). Search the number on the official Tamil Nadu RERA website (rera.tn.gov.in) to confirm the promoter name, sanctioned plan, number of units registered and declared completion date before you pay anything. RERA also requires developers to keep 70% of buyer collections in a separate project account, to state carpet area, and to compensate buyers for delays.
Prices, dates and specifications are indicative and subject to change. Please confirm the latest details before booking. See Disclaimer.
If Ashiana Swarang Phase II doesn't fit your budget or timeline, these are worth a look.
Ashiana Swarang Phase II is at Nemmeli, ECR, Chennai. Nemmeli is on East Coast Road between Kovalam and Mahabalipuram, where the Buckingham Canal backwaters meet the sea.
Ashiana Swarang Phase II is developed by Ashiana Housing Ltd (with Arihant Foundations).
Ashiana Swarang Phase II is priced ₹82 L onwards. Prices exclude GST (where applicable), stamp duty, registration and other charges, and vary by floor, facing and view.
1 BHK: about 912 sq ft; 2 BHK: about 1,227 sq ft; 3 BHK: about 1,462 sq ft.
TN/35/Building/0242/2025 (Phase II); TN/35/Building/0057/2024 (Phase I). Verify it on the Tamil Nadu RERA website (rera.tn.gov.in) before paying.
January 2028 (RERA).
Land: 10.87 acres. Homes: About 585 homes (all phases). Structure: Low-rise blocks, stilt + 5.
Senior-friendly design throughout, 24x7 care and emergency response, community dining and kitchen, activity centre and library, landscaped walking paths.
Kovalam beach (about 5 km); Kelambakkam hospitals (about 12 km); Mahabalipuram (about 20 km); Sholinganallur (about 25 km).
It depends on your horizon. In its favour: Purpose-built senior living; Low-rise, low-density. The main trade-off: Higher monthly service charges. Compare carpet-area prices with nearby projects before you decide.
On an 80% loan against the entry price at 8.5% for 20 years, the EMI would be about ₹56,929 per month. Use the calculator on this page to change the loan, rate and tenure.
Use the enquiry form on this page. We'll send the current price sheet, floor plans and payment plan, and arrange a site visit.
Tell us the configuration, your budget and when you'd like to move in. We'll reply with availability, the price sheet and a visit slot.